高分求翻译一段话(谢绝翻译软件,翻得好再送50分)

2024-11-23 11:32:38
推荐回答(2个)
回答1:

In this paper, across the Canal Road along the river as an example, the Canal Bridge and the Canal tunnel construction cost estimates, compare the project cost at the difference. Ways to use SWOT analysis to compare the bridge with the tunnel option is good or bad. In the tunnel operating costs and economic benefits calculated on the basis of analysis of the economic feasibility of the tunnel. Canal tunnel construction project risk assessment and classification, identify key risk factors and come up with strategies. In considering the overall economic benefits, social benefits under the premise of the project area in light of the importance of high environmental sensitivity, landscape requirements specific characteristics, select the tunnel option.

回答2:

Based on the riverside boulevard across the canal, for example, to the canal bridge and tunnel construction cost of the canal are calculated, compares the differences in the engineering cost. With SWOT analysis method, and compared the bridge tunnel scheme. In the tunnel operation cost and economic benefit calculation based on the analysis of the tunnel, and economically feasible. The construction of the canal tunnel project risk evaluation and classification, the main risk factors and puts forward some countermeasures. In consideration of the overall scheme of the economic benefit and social benefit with engineering, environmental sensitivity high location, landscape features of the high requirements, choose the tunnel scheme.